TM 5-4210-233-14&P-2
SECTION II MAINTENANCE ALLOCATION CHART
MAINTENANCE ALLOCATION CHART
NOMENCLATURE OF END ITEMS: TRUCK, 100 FT. AERIAL LADDER
(1)
(2)
(3)
(4) MAINTENANCE LEVEL
(5)
(6)
DIRECTGENERAL
GROUP
COMPONENT/
MAINT.
UNIT
SUPPORTSUPPORTDEPOTTOOLS &
NO.
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIP.
REMARKS
07
CAB ASSEMBLY, LIGHTS, AND
CONTROLS (Continued)
WINDSHIELD WIPER BLADES
Inspect
.25
Replace
.25
1
CAB MOUNTING BRACKETS
Inspect
.25
Replace
6.0
1, 4
08
1 2-VOLT DC ELECTRICAL SYSTEM
BATTERY ISOLATOR
Test
0.5
Replace
1.0
1
BATTERIES
Inspect
.25
Service
.25
Test
.50
1
Replace
.50
1
BATTERY BOXES
Inspect
.25
Repair
1.0
1
BATTERY CHARGE RECEPTACLE
Replace
.50
1
09
100-VOLT AC ELECTRICAL SYSTEM
Test
1.0
Inspect
.10
1
Replace
1.0
1
AERIAL CIRCUIT ON/OFF SWITCH
Inspect
.10
Replace
1.0
1
CIRCUIT BREAKERS
Replace
.50
1
Replace
1.0
1
12 VDC IN-LINE FUSE
Replace
.25
1
Replace
1.0
1
B-14