TM 5-4210-233-14&P-2
SECTION II MAINTENANCE ALLOCATION CHART
MAINTENANCE ALLOCATION CHART
NOMENCLATURE OF END ITEMS: TRUCK, 100 FT. AERIAL LADDER
(1)
(2)
(3)
(4) MAINTENANCE LEVEL
(5)
(6)
DIRECTGENERAL
GROUP
COMPONENT/
MAINT.
UNIT
SUPPORTSUPPORTDEPOTTOOLS &
NO.
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIP.
REMARKS
02
PUMP COMPARTMENT (Continued)
CROSSLAY HOSE BIN ROLLERS
Inspect
.10
Replace
1.0
1
GAUGES, CROSSLAY, DISCHARGE, PUMP
Inspect
.25
PRESSURE AND VACUUM
Replace
1.0
1
GAUGES, ENGINE STATUS
Inspect
.25
Replace
1.0
1
WATER TANK LEVEL GAUGE
Inspect
.50
Test
1.0
Replace
1.0
1
Repair
1.0
1
Inspect
.10
Replace
1.0
1
PUMP PANEL INDICATOR LIGHTS
Inspect
.50
Replace
1.0
1
Repair
1.0
1
ENGINE COOLER VALVE
Replace
1.0
1
PRIMER CABLE
Replace
1.0
1
PUMP PANEL TOGGLE SWITCHES
Inspect
.50
Replace
.25
1
OPERATOR'S PANEL, STREETSIDE
Inspect
.50
Replace
8.0
1, 4
THROTTLE CONTROL
Inspect
.10
Replace
2.0
1
GAUGE PANEL ENCLOSURE
Inspect
.10
Replace
1.0
1
OPERATOR'S PANEL, CURB SIDE
Inspect
.50
Replace
3.50
1,4
B-5