Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TRANSMISSION GOVERNOR
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-233-14&P-1 5-29.  TRANSMISSION GOVERNOR This task covers: a. Removal c. Follow-on Maintenance b. Installation TOOLS REQUIRED EQUIPMENT CONDITION Tool kit, General Mechanics, Automotive Main Engine Shutdown (see para 2-12.) (Appendix B, Section APU Shutdown (see para 2-16.) Batteries Disconnected (see para 4-114.) MATERIALS/PARTS REQUIRED Gasket (Figure 143, Appendix F) a Removal. (1)   Place suitable container under governor cover to catch oil. (2)   Remove four bolts (1) that retain governor cover (2) and gasket (3). (3)   Remove the cover and gasket. Discard gasket. (4)   Remove the governor (4) by rotating it clockwise. b. Installation. (1)   Install governor (4) by rotating it counterclockwise. (2)   Install new gasket (3), cover (2) and four bolts (1). (3) Torque bolts (l) to 13-16ft. Ib. (18-22 N.m). c. Follow-on Maintenance (1)   Connect batteries (see para 4-114) 5-189

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business