| |
TM 5-4210-233-14&P-1
5-30. SPEEDOMETER CABLE ASSEMBLY
This task covers:
a.
Removal
c.
Follow-on Maintenance
b.
Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
a.
Removal.
(1) Disconnect sender (1).
(2) Unthread sleeve (2) and remove cable (3).
b.
Installation.
(1) Thread sleeve (2) into mounting until tight.
(2) Connect sender (1) to receptacle.
c.
Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
5-190
|