| |
TM 5-4210-233-14&P-1
4-219. MITER BOX - Continued
e.
Installation.
(1)
Attach miter box (5) to bracket (7) with four screws (6).
(2)
Install shafts (3 and 4) on miter box (5).
(3)
Torque nuts (1 and 2) to 35 ft lb (48 N.m).
f.
Follow-on Maintenance.
(1)
Apply grade 2 grease through grease fitting (9) until it is relieved by relief fitting (8).
(2)
Connect batteries (see para 4-114).
4-540
|