TM 5-4210-233-14&P-1
4-220. PREPARATION FOR STORAGE OR SHIPMENT
This task covers:
a.
Introduction
c.
Storage Site Selection
b.
Maintenance and Repair
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
MATERIALS/PARTS REQUIRED
Cleaning Solvent (Item 3, Appendix E)
a.
Introduction. Placement of equipment in administrative storage should be for short periods of
time when a shortage of maintenance effort exists. Items should be in mission readiness within
24 hours or within the time factors as determined by the directing authority. During the storage
period appropriate maintenance records will be kept.
b.
Maintenance and Repair. Before placing equipment in administrative storage, current
maintenance services and Equipment Serviceable Criteria (ESC) evaluations should be
completed, shortcomings and deficiencies should be corrected, and all Modification Work Orders
(MWO-s) should be applied.
c.
Storage Site Selection. Inside storage is preferred for items selected for administrative storage.
4-541/(4-542 Blank)
|