| |
TM 5-4210-233-14&P-1
5-55. SWING CROSSOVER RELIEF MANIFOLD BLOCK
This task covers:
a.
Removal
c.
Follow-on Maintenance
b.
Installation
TOOLS REQUIRED:
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12.)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16.)
Batteries Disconnected (see para 4-114.)
Ladder Bedded (see para 2-14.)
a.
Removal.
(1) Remove four screws (1) and remove
shroud (2).
(2) Tag and remove six hydraulic hoses (3)
from swing crossover relief manifold block
(4).
(3) Cap hydraulic hoses (3) and plug swing
crossover relief manifold block (4) ports.
(4) Remove two mounting bolts (5) and
lockwashers
(6)
and
remove
swing
crossover relief manifold block (4).
b.
Installation.
(1) Secure swing crossover relief manifold
block (4) with two mounting bolts (5) and
lockwashers (6).
(2) Install six hydraulic hoses (3).
(3) Install shroud (2) and secure with four
screws (1)
c.
Follow-on Maintenance
(1) Connect batteries (see para 4-114).
5-340
|