|
|
TM 5-4210-233-14&P-1
4-46. TANK FILL AND RECIRCULATING VALVE
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection f. Follow-on Maintenance
MATERIAL/PARTS REQUIRED:
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
MATERIALS/PARTS REQUIRED
All Piping Drained (see para 2-17 .)
Dry Cleaning Solvent (Item 3, Appendix E)
Grease, Silicone (Item 11, Appendix E)
Repair Kit (Figure 12, Appendix F)
a. Removal
(1) Remove 4 screws (1) from foam tank
compartment grate (2); remove grate.
(2) Locate tank fill and recirculating valve
by operating handle on streetside
operator's panel.
(3) Remove cotter pin (3) and retaining pin (4).
4-238
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |