Click here to make tpub.com your Home Page

Page Title: Assembly
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-45. #1, #2, #3 and #4 DISCHARGE VALVES - Continued
d. Assembly.
CAUTION
Apply silicone grease (Item 11, Appendix E) to all O-rings before assembly.
Failure to do so could result in damage to O-rings.
(1) Install new O-rings (27) and (28).
(2) Install ball (24) in valve body (15).
(3) Install new O-ring (26) on upper stem bushing (25).
(4) Install upper stem bushing (25).
(5) Install new O-ring (23).
(6) Place four new springs (22) in holes of new seal (21).
(7) Install new O-ring (20) on seal retainer (19).
(8) Assemble seal (21) and seal retainer (19), and install on valve body (15).
(9) Install four socket head capscrews (18).
e. Installation.
(1) Install new O-ring (17).
(2) Install valve (15) in mounting flange (16) and rotate to secure in place.
(3) Tighten four capscrews (14).
(4) Apply pipe sealant (Item 2, Appendix E) to pipe nipple (12) and hose adapter (13) threa s.
d
(5) Install pipe nipple (12) and hose adapter (13).
(6) Secure plate (11) to valve body (1 5) with four capscrews (10).
(7) Secure sector (7) in position marked when removed to shaft (8) with roll pin (9).
(8) Install U-bolt (6), bracket (5), two lockwashers (4), and two hex nuts (3).
(9) Install pressure hose (2) and drain hose (1).
f. Follow-on Maintenance.
(1) Install Curbside Pump Panel (see para 4-26).
(2) Connect Batteries (see para 4-114).
4-237

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business