Click here to make tpub.com your Home Page

Page Title: CURB SIDE OPERATOR'S PANEL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-26. CURB SIDE OPERATOR'S PANEL
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para. 2-12.)
(Appendix B. Section Hi, Item 1)
APU Shutdown (see para. 2-16.)
Batteries Disconnected (see para. 4-114.)
a . Removal
NOTE
Make provision for draining of water from suction and discharge lines.
(1) Close (push forward) all T-handles for valves on street-side panel.
(2) Remove 6-inch suction cap (1) and two 2-1/2 inch discharge caps (2).
(3) Remove two 45elbows (3).
(4) Remove oil tank access door (4) by removing four screws (5), nuts (6), lock washers (7) and flat
washers (8).
4-190

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business