|
|
TM 5-4210-233-14&P-1
4-26. CURB SIDE OPERATOR'S PANEL
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para. 2-12.)
(Appendix B. Section Hi, Item 1)
APU Shutdown (see para. 2-16.)
Batteries Disconnected (see para. 4-114.)
a . Removal
NOTE
Make provision for draining of water from suction and discharge lines.
(1) Close (push forward) all T-handles for valves on street-side panel.
(2) Remove 6-inch suction cap (1) and two 2-1/2 inch discharge caps (2).
(3) Remove two 45elbows (3).
(4) Remove oil tank access door (4) by removing four screws (5), nuts (6), lock washers (7) and flat
washers (8).
4-190
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |