Click here to make tpub.com your Home Page

Page Title: Y-STRAINER AND 1-1/2" CHECK VALVE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
4-37. Y-STRAINER AND 1-1/2" CHECK VALVE
This task covers:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection f. Follow-on Maintenance
TOOLS REQUIRED
EQUIPMENT CONDITION
Tool Kit, General Mechanics, Automotive
Main Engine Shutdown (see para 2-12 .)
(Appendix B, Section III, Item 1)
APU Shutdown (see para 2-16 .)
Batteries Disconnected (see para 4-114 .)
MATERIALS/PARTS REQUIRED
Curbside Pump Panel Removed (see para 4-26 .)
Pipe Sealant (Item 2, Appendix E)
Foam Valve Removed (see para 4-41 .)
a. Removal.
(1) Remove pipe (1) from Y-strainer (6).
(2) Remove drain hose (2) from Y-strainer (6).
(3) Remove two nuts (3) and lockwasher (4) and U-bolt (5).
(4) Remove Y-strainer (6) from nipple (7).
(5) Remove nipple (7), elbow (8), nipple (9), 1-1/2" check
valve (10), nipple (11) and elbow (12).
4-206

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business