|
|
TM 5-4210-233-14&P-1
4-36. RELIEF VALVE PILOT ASSEMBLY- Continued
c. Follow-on Maintenance.
(1) Connect batteries (see para 4-114).
(2) Start engine, operate pump and test operation of relief valve pilot. Check for leaks.
(3) Install gauge panel (see para 4-18).
4-205
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |