|
|
TM 5-4210-233-14&P-1
Table 2-1. Operator PMCS Procedures - Continued
Item
Interval
Equipment Is Not
No. A D W
ITEM TO BE INSPECTED/Procedures
Ready/Available If:
18
AERIAL LADDER AND WATER TOWER
ASSEMBLY - Continued
Aerlal Ladder Intercom
Operate aerial ladder intercom. Ensure proper
- Intercom does not work.
operation. Check toggle switch boot is in place and
free of cracks. Check attaching hardware is in place.
Report any deficiencies to Unit Maintenance.
Monitor and Nozzle, Controls
Operate monitor and nozzle functions. Check for
- Monitor and nozzle does
smooth operation through full range of motion.
not work.
Ensure nozzle end rotates smoothly.
Front and Rear Extension Cylinders, Hoses, Tubes
and Fittings
Visually inspect for leaks.
- Major hydraulic oil
leaks.
Check hoses for signs of abrasion, kinks, pinching.
Report any deficiencies to Unit Maintenance.
Aerial Ladder Tension Cables
Inspect for fraying, tightness. Check cables are
- Cables are sagging or
tracking properly in sheaves. Report any deficiencies
frayed.
to Unit Maintenance.
Aerial Ladder Electrical Cables
Inspect for broken insulation, proper tension. Check
- Cable or insulation
cables do not sag, track properly in sheaves. Report
broken, major sagging.
any deficiencies to Unit Maintenance.
19
AUXILIARY POWER UNIT (APU)
APU Inspect
Check for oil/fuel leaks, blocked or clogged cooling air
inlet. Clean as required.
2-44
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |