|
|
TM 5-4210-233-14&P-1
Table 2-1. Operator PMCS Procedures - Continued
Item
Interval
Equipment Is Not
No. A D W
ITEM TO BE INSPECTED/Procedures
Ready/Available If:
19
AUXILIARY POWER UNIT (APU) - Continued
APU Inspect - Continued
Check for tightness of electrical connections. Check
cables for damaged insulation.
Report any oil or fuel leak, loose electrical connection
or damaged cable to Unit Maintenance for repair.
Check muffler is secure and intact. Report any
deficiencies to Unit Maintenance.
APU Test
Start APU as detailed in para 2-16. Let engine
indicate smooth 110 VAC output. Report fluctuating
output to Unit Maintenance.
2-45
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |