Click here to make tpub.com your Home Page

Page Title: Table 2-1. Operator PMCS Procedures-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
Table 2-1. Operator PMCS Procedures - Continued
Item
Interval
Equipment Is Not
No.  A  D  W
ITEM TO BE INSPECTED/Procedures
Ready/Available If:
18
AERIAL LADDER AND WATER TOWER
ASSEMBLY - Contlnued
Control Panel Indicator Llghts, Swltches
Check for visible damage. Check that lamps
- Any switches or
illuminate. Check switches for proper operation.
indicator lights are
Ensure that rubber boots are in place and free of
inoperable.
cracks. Report any deficiencies to Unit Maintenance.
Ladder Load Gauge, System Pressure Gauge
(0-3000 PSI), Water Pressure Gauge (0-600 PSI)
Check gauges for damage, cracked or broken face,
- Any gauges
broken indicator. Report any broken gauge to Unit
inoperable.
Maintenance.
Flow Minder
Check for cracked or broken display panel. Be sure
- Flow Minder inoperable.
attaching hardware is in piace.
Hoist Cylinders, Swlng Motor Planetary $peed
Reducer
Check for any signs of hydraulic oil leakage. Check
lines for signs of abrasion.
Swlng Brake
Operate swing motor on aerial ladder. Ladder swing
- Swing brake does not
should stop immediately on release of swing control.
work.
Report any deficiencies to Unit Maintenance.
Emergency Hydraullc Pump
Activate emergency hydraulic pump switch and listen
- Emergency hydraulic
to confirm pump is running.
pump is inoperable.
2-43

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business