Click here to make tpub.com your Home Page

Page Title: Table 2-1. Operator PMCS Procedures-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
Table 2-1. Operator PMCS Procedures - Continued
Item
Interval
Equipment Is Not
No.  A  D  W
ITEM TO BE INSPECTED/Procedures
Ready/Available If:
17
FRAME AND BUMPER ASSEMBLY Continued
Tow Hooks
Be sure tow hooks are not bent out of shape and
attaching hardware is tight. Refer to Unit Maintenance
for repair.
Front Frame Extension
Check that attaching hardware is tight. Ensure
- Attaching hardware
extension is free of damage or distortion.
totally missing from
one
end of frame extension.
Wheel Chock Brackets
Check brackets are tight and attaching hardware is in
place. Inspect for visible damage or distortion.
18
AERIAL LADDER AND WATER TOWER
ASSEMBLY
Ladder Treads, Safety Railings
Check ladder treads for damage/missing.
Check that safety railings are securely fastened,
attaching hardware is in place.
Report deficiencies to Unit Maintenance.
OutriggerWarning/Compartment Lights
Check that all iamps illuminate properly. Check
lenses are not cracked and mountings are secure.
Aerial Ladder Spotlights
Check that lamps illuminate. Check switches function
properly. Ensure rubber boots on switches are not
damaged/missing. Check that spotlight housing is not
damaged. Check lens is not cracked or broken.
2-42

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business