Click here to make tpub.com your Home Page

Page Title: Table 2-1. Operator PMCS Procedures-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
Table 2-1. Operator PMCS Procedures
Item
Interval
Equipment Is Not
No.  A  D  W
ITEM TO BE INSPECTED/Procedures
Ready/Available If:
2
PUMP COMPARTMENT
Lights
Set pump panel light switch to on position.
Check that pump panel lights illuminate. Check that
following gauge back lights illuminate:
WATER TEMPERATURE
OIL PRESSURE
TRANSMISSION OIL TEMPERATURE
VOLTS
FUEL
ENGINE RPM
Check that each compartment light illuminates.
Check that each step light illuminates.
Hose Bin Rollers, Dividers
Confirm rollers move freely. Check dividers for
damage.
Gauges
Inspect gauge for visible damage. Check that all
- Any gauge is damaged
segments of water tank level gauge illuminate when
or inoperable.
water tank is full.
Pump Panel Lights, Switches
Inspect for visible damage. Check that rubber toggle
- Any switch is damaged
switch boots are in place, free of cracksldamage.
or inoperable.
Pump Panel Throttle Control
Inspect for visible damage.
Relief Valve
With water pump operating, turn relief valve to ON
position. Increase and/or decrease setting and check
that OPEN and CLOSED lights illuminate. If lights do
not illuminate, notify Unit Maintenance to troubleshoot.
2-30

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business