|
|
TM 5-4210-233-14&P-1
Table 2-1. Operator PMCS Procedures -Continued
Item
Interval
Equipment Is Not
No. A D W
ITEM TO BE INSPECTED/Procedures
Ready/Available If:
2
PUMP COMPARTMENT - Contlnued
Relief Valve Strainer
Remove strainer and clean screen. Inspect screen for
damage. If screen is damaged, it must be replaced
(see Parts List, Appendix F).
Discharge ConnectionslChrome Adapters
Inspect for visible distortion, thread damage, cracks.
Report any damage to Unit Maintenance.
Street/Curb Side Panel, Pump Panel, Enclosure
Cover and Runnlng Boards
Inspect for visible damage. Be sure attaching
- Attaching hardware
hardware is in place. Tug on pump panel enclosure
totally missing from panel
cover handle to ensure cover is fastened securely.
cover, or running
boards.
Pull-Out Tread Plate
Inspect cables and latches, adjust if necessary. Be
sure slides are greased and work easily.
Prlmlng Pump Oil Tank
Check level of fluid in priming tank. Top up with
correct weight oil as required.
3
PROPELLER SHAFT ASSEMBLY
Drive Shafts
Grasp each drive shaft and attempt to rotate and
move up and down. There should be no slack. Report
any movement to Unit Maintenance.
4
PUMP, PIPING SYSTEM, AND VALVES
Fire Pump
Examine pump for signs of oil or water leaks.
2-31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |