Click here to make tpub.com your Home Page

Page Title: Table 2-1. Operator PMCS Procedures
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-233-14&P-1
Table 2-1. Operator PMCS Procedures
Item
Interval
Equipment Is Not
No.  A  D  W
ITEM TO BE INSPECTED/Procedures
Ready/Available If:
1
ACCESSORIES
Hard Suctlon Hoses
Inspect hose for tears, cuts and missing or damaged
gaskets. Inspect couplings for thread damage. Report
any failed hose to Unit Maintenance for repair.
Soft Suction Hoses
Inspect hose for kinks, tears, cuts, burns, chemical
- Hose missing or
damage and missing or damaged gaskets. Report
severely damaged.
any failed hose to Unit Maintenance for repair.
Axes
Inspect handle for cracks, damage, loose head.
Replace any damaged axe.
Pike Poles
Inspect for loose head, damaged pole. Replace any
damaged pike pole.
Ladders
Inspect for distorted or cracked side rails and rungs,
loose rungs or inoperative locking mechanisms.
Replace any damaged ladder.
Strainer, Reducer
Check if missing. Inspect for thread damage,
distortion, cracks. Replace if necessary.
2-29

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business