|
|
TM 5-4210-224-14&P
4-37. GAUGES, CONTROL KNOBS, AND SWITCH REPLACEMENT (Continued).
b. Control Knob Installation.
NOTE
This procedure is typical for the
following control knobs. ENGINE
THROTTLE
CONTROL
(12),
RELIEF VALVE CONTROL FLUSH
(13),
#1
PRECONNECT
DISCHARGE OUTLET CONTROL
(14),
#2
PRECONNECT
DISCHARGE OUTLET CONTROL
(15), 2-1/2 INCH DISCHARGE
OUTLET
CONTROL
(16),
BOOSTER OUTLET CONTROL
(17), PRIMER CONTROL (18),
WATER TANK DRAIN (19), 2-1/2
INCH
DISCHARGE
OUTLET
DRAIN (20), REAR 3 INCH
SUCTION INLET CONTOL (21),
PRESSURE RELIEF CONTROL
(22), TANK FILL CONTROL (23), 3
INCH SUCTION INLET CONTROL
(24),
PRESSURE
RELIEF
CONTROL (25), AND HEAT
EXCHANGER CONTROL (26).
Turn knob (27) clockwise and secure to shaft (28).
c. Switch Installation.
(1)
Attach terminal lugs (33) with screws (32) on
switch (30). Remove tags.
(2)
Insert toggle switch (30) in-to hole in plate
(31).
(3)
Secure with retaining nut (29) on front of
toggle switch (30).
4-70
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |