Click here to make tpub.com your Home Page

Page Title: CALIBRATION AND TEST PORT REPLACEMENT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4210-224-14&P
4-38. CALIBRATION AND TEST PORT REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Equipment Condition
Tools
Para. Condition Description
General Mechanics Tool Kit
4-26 Hose Bed Floors Removed
Materials/Parts
4-27 Hose Rollers Removed
Test Panel (Type 44)
4-28 Hose Bin Dividers Removed
4-30 Compartment Light Removed
4-31 Roof Panel Removed
General Safety Instructions
Engine OFF
Transmission in (N) neutral.
Parking brake and micro-brake lock set.
Batteries disconnected.
REMOVAL
f. Install hose bin dividers (paragraph 4-28).
a. Remove vacuum plug (1) and pressure plug (2).
g. Install hose rollers (paragraph 4-27).
b. Remove screws (3) securing name plate (4) to
h. Install hose bed floors (paragraph 4-26).
pump panel.
i. Reconnect batteries.
c. Remove calibration and test fittings (5).
INSTALLATION
a. Connect calibration and test fittings (5).
b. Position nameplate (4) on pump panel and
secure with screws (3).
c. Install pressure plug (2) and vacuum plug (1).
d. Install roof panel (paragraph 4-31).
e. Install compartment light (paragraph 4-30).
4-71

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business