Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ADJUSTMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-220-34 2-19. ENGINE - Continued (9)     Check  the  torque  by  pushing  down  on  the injector  rack  with  the  tip  of  a  screwdriver. The rack should swivel freely about it’s axis, when released it should spring back upward (10)  Remove  the  split  pin  (9)  and  the  clevis  pin (10) from the left hand fuel rod and injector control tube lever (11)  Install  the  clevis  pin  (3)  and  split  pin  (2)  to connect the right hand fuel rod and injector control tube lever. (12)  Repeat   steps   7   thru   9   for   the   No.      1   R injector control rack lever. (13)  Do  not  alter  No.    1L  and  No.    1R  settings once completed. 2-195

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business