| |
TM 5-4210-218-13&P
b.
The ambient temperature of the operational site must be maintained between + 20 ° F and + 100°F (-7°C and
+38°C) while the Recovery / Recharger Unit is being operated.
4-4.3 Unpacking the Equipment.
a. Transport the shipping container to the operational site using a fork lift.
b. Snip the bands and disassemble the shipping container. Store reusable packing materials for possible reshipment
of equipment.
4-4.4 Inspecting the Equipment.
a. Visually inspect Recovery / Recharger Unit components for any damage which may have occurred during
shipment.
b. Verify that Recovery / Recharger Unit is complete as listed on the packing slip. Report all discrepancies in
accordance with DA PAM 738-750.
4-4.5 Tools Required for Installation. Tools required to install the Recovery / Recharger Unit are stored in the tool box.
4-4.6 Scale Assemblv Installation. Refer to paragraph 4-12.
4-4.7 Hoist Winch Assemblv Installation. The hoist winch assembly is placed across the top of the equipment during
shipment. Unpack the assembly and refer to paragraph 4-8 for installation instructions.
4-4.8 Fire Extinguisher and Cylinder Hose Installation. Hoses will be attached to the appropriate valves and gauges
except for the nitrogen hose which will be in the tool box. All adapters will also be found in the tool box.
NOTE
Regulator secured to scale frame at agitator bracket location by two U-bolts
4-4.9 Nitrogen Pressure Regulator Installation.
a. Remove four nuts and washers from U-bolts.
b. Remove U-blots and regulator.
c.
Reinstall washers and nuts on U-bolts and store in tool box.
d. Remove nitrogen hose from tool box and install on regulator.
e. Store assembly in tool box pending use 4-4.10 Operational Test. Perform the procedures specified in Section III
of Chapter 2 to determine if the Recovery / Recharger Unit is ready for operation.
4-2
|