Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CHAPTER 4 UNIT MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4210-218-13&P CHAPTER 4 UNIT MAINTENANCE INSTRUCTIONS SECTION I.  REPAIR PARTS, SPECIAL TOOLS, AND SUPPORT EQUIPMENT 4-1  COMMON TOOLS AND EQUIPMENT. For   authorized   common   tools   and   equipment   refer   to   the   Modified   Table   of   Organization   and   Equipment   (MTOE) applicable to the unit authorized to have the Recovery / Recharger Unit. 4-2  SPECIAL TOOLS AND SUPPORT EQUIPMENT. Special tools required for maintenance of the Recovery / Recharger Unit are listed in Appendix B.  No support equipment is required for maintenance of the Recovery / Recharger Unit. 4-3  REPAIR PARTS. Repair parts are listed and illustrated in Appendix C to this manual. SECTION II.  SERVICE UPON RECEIPT 4-4  EQUIPMENT UNPACKING AND INSTALLATION. 4-4.1  Packaging Data.  The Recovery / Recharger Unit is shipped partially assembled in a large shipping container.  This container may be moved using a forklift.  The Recovery / Recharger Unit is shipped in the following condition. a. All components are assembled and mounted on the base with the exception of the hoist winch assembly, and the scale assembly.  The hoist winch assembly is placed across the top of the equipment during shipment.  The scale assembly is strapped to the lid of the tool box. b. The tilt rack assembly is secured in the non-inverted position with the tilt rack lock down chain. c. The nitrogen pressure regulator is attached securely to the shaker bracket with two U-bolts. d. All tools and loose hardware are stored in the tool box. 4-4.2  Site and Shelter Requirements. a. The  Recovery  /  Recharger  Unit  does  not  have  particular  site  requirements  but  must  be  positioned  close  to  a compressed air source with a capability to provide air at a maximum of 175 psi at 15 CFM. 4-1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business