Click here to make tpub.com your Home Page

Page Title: Amplifier Card A13 Test Theory - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4931-363-14&P
contact 2 of S7-E to J9-9 and -23 to energize the
card will sense the difference between the two signal
noninverting input of AR5 and AR7. Setting S4 to position
amplitudes. With S9 set to position R3, the output of AR2
9 connects 5 volts ac, out of phase, through wiper 1 and
at J9-33 is connected to the meter for readout.
contact 10 of S4-G, and through wiper 2 and contact 8 of
S7-E to J9-11 and -25 to energize the inverting inputs of
(9) Refer to step 8 in figure 2-12 and in the A13 test
AR5 and AR7. As in the previous step, AR5 and AR7 will
table. Setting S9 to position R2 connects the output of
sense the difference between the two signal amplitudes.
AR4 on the A13 card at J9-27 to the meter for readout.
With S9 set to position R2, the output of AR8 at J9-3 is
Card operating power remains connected as previously
connected to the meter for readout.
discussed.
(11) Refer to step 10 in figure 2-12 and in the A13
test table. Setting S9 to position R3 connects the output of
(10) Refer to step 9 in figure 2-12 and in the A13
AR6 at J9-13 to the meter for readout. Card operating
test table. Setting S7 to position 1 connects 9 volts ac, out
power remains connected as previously discussed.
of phase, from the wiper of R8 through wiper 1 and
2-60

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business