Click here to make tpub.com your Home Page

Page Title: Boresight Retention Inspection - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1240-375-34&P
0100 00
TEST AND INSPECTION - Continued
Boresight Retention Inspection - Continued
13
6
9
7
3
1 fc 6 5 6
11.
Turn azimuth knob (6) until head assembly (13) makes one complete revolution.
12.
Check that 3200 appears on azimuth counter (9).
Check that vertical reticle line is centered on collimator reticle target or within 0.25 mil.
13.
Check that reading on deflection counter (7) is within 0.25 mil of reading on azimuth counter (9).
14.
15.
Rotate azimuth test fixture scale (3) to 1600 mils.
16.
Repeat steps 4 through 14 with 0000 on deflection counter (7) and azimuth counter (9).
Azimuth Knob Backlash Inspection
1
4
5
6
3
2
1 fc 6 5 7
1.
Mount M137/M137A2/M137A3 telescope (1) on azimuth test fixture (2). Refer to Mounting Telescope
to Azimuth Test Fixture.
0100 00-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business