|
|
TM 9-1240-375-34&P
0100 00
TEST AND INSPECTION - Continued
Mounting Telescope to Azimuth Test Fixture
3
1
2
1 fc 6 5 2
1.
Place M137/M137A2/M137A3 telescope (1) on fixture adapter (2).
2.
Install four bolts (3) to secure M137/M137A2/M137A3 telescope (1) to fixture adapter (2).
Boresight Retention Inspection
NOTE
The cover plate on the head assembly should be closed to help eliminate parallax
between the M137/M137A2/M137A3 telescope and the collimator projector, wall
targets, and plumblines.
1
5
4
3
2
1 fc 6 5 3
1.
Mount M137/M137A2/M137A3 telescope (1) on azimuth test fixture (2). Refer to Mounting Telescope
to Azimuth Test Fixture.
2.
Set azimuth test fixture scale (3) to 4800 mils.
3.
Turn correction knob (4) until correction counter (5) reads zero.
0100 00-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |