Click here to make tpub.com your Home Page

Page Title: Mount Rigidity Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1240-375-34&P
0073 00
TEST AND INSPECTION - Continued
Mount Rigidity Inspection - Continued
Table 1. Mount Rigidity Inspection--Elevation, Cant, and Total Movement Data.
Elevation
Elevation
Cant angle
Total movement
(mils)
(degrees and minutes)
(mils)
(mils)
0
0
0
0.25
800
44 54'
0
0.75
1100
51 53'
0
1.75
1333
74 59'
0
3.50
Azimuth Correction Inspection
1
3
4
2
1 fc 4 7 6
1.
Secure M137/M137A2/M137A3 telescope (1) to optical instrument support (2).
2.
Level the cross-leveling fixture in elevation and cant.
NOTE
Ensure bubble in cross level vial and bubble in elevation level vial on M171/M171A1
mount are centered.
3.
Set azimuth counter (3) at 4800 mils.
4.
Release azimuth counter eccentric (4), align M137/M137A2/M137A3 telescope reticle line on wall
target, and engage azimuth counter eccentric.
0073 00-34

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business