| |
TM 750-116
i.
Tank Thermal Sight,
(1) Commanders Display (fig. 3-59)
Figure 359 Commanders Display
(a) Perform purging and charging procedure para
2-5.a.
(b) Purge instrument at 8 psig for 5 minutes.
(c) Ensure relief valve closes at 5 psig.
(d) Leak test for minimum of 5 minutes.
(2) Gunners Display (fig. 3-60). Refer to para
3-13.i.(1) for procedures.
Figure 3-60 Gunners Display
(3) Head Assembly (fig. 3-61). Refer to para
3-13.i.(1) for procedures.
Figure 3-61 Head Assembly
(4) Power Converter (fig. 3-62). Refer to para
3-13.i.(1) for procedures.
Figure 3-62 Power Converter
3-26
|