Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Tank Thermal Sight,
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   750-116 i. Tank  Thermal  Sight, (1)  Commander’s  Display  (fig.  3-59) Figure  3–59  Commander’s  Display (a) Perform  purging  and  charging  procedure  para 2-5.a. (b) Purge instrument at 8 psig for 5 minutes. (c) Ensure relief valve closes at 5 psig. (d) Leak test for minimum of 5 minutes. (2)  Gunner’s  Display  (fig.  3-60).  Refer  to  para 3-13.i.(1) for procedures. Figure  3-60  Gunner’s  Display (3) Head  Assembly  (fig.  3-61).  Refer  to  para 3-13.i.(1) for procedures. Figure  3-61  Head  Assembly (4)  Power  Converter  (fig.  3-62).   Refer  to  para 3-13.i.(1) for procedures. Figure  3-62  Power  Converter 3-26

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business