TM 55-1925-292-14&P
0019 00
INSTALLATION
1. Install the thermal heat detector (figure 2, item 6) into the junction box cover (figure 2, item 2), and secure it
with the retaining nut (figure 2, item 5).
2. Connect the wiring (figure 2, item 4) using the labels from step 2 of Removal as a guide. Remove the labels.
3. Install the junction box cover (figure 2, item 2) on the junction box (figure 2, item 3), and secure it with the two
screws (figure 2, item 1).
4. Perform the Follow-On Service procedure described at the end of this work package.
FOLLOW-ON SERVICE
1. Remove the lockouts and tagouts (FM 55-502).
2. Set to ON the FIRE DETECTION SYSTEM. circuit breaker in 120V emergency distribution panel No. 1.
3. Test the fire detection system (WP 0017 00) and observe that the system operates properly.
4. Return the equipment to the desired readiness condition.
END OF WORK PACKAGE
0019 00-4
|