Click here to make tpub.com your Home Page

Page Title: TROUBLESHOOTING PROCEDURES - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1925-292-14&P
0009 00
From Sheet 1
From Sheet 1
A
B
Reset the circuit breaker by
setting it to OFF and then
setting it to the ON position.
Is
the circuit
No
Set the circuit breaker
breaker in
to the ON position.
the ON
position?
Yes
Is
the POWER
Verify that the AFFF
Replace the inline fuses
No
AVAILABLE lamp
pump motor controller
in the AFFF pump
illuminated on the AFFF
disconnect switch is ON.
motor controller
pump motor
(TM 55-1925-273-24&P).
controller?
Yes
From Sheet 1
C
Is
the POWER
Yes
AVAILABLE lamp
lit on the AFFF
pump motor
controller?
No
AFFF pump motor controller
is faulty. Notify the
maintenance supervisor
of the defect.
Will
Yes
the AFFF
pump run?
No
Exit
Notify the maintenance
supervisor of the defect.
Procedure 3. AFFF Pump Does Not Run (Sheet 2 of 2)
0009 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business