ENGINE ROOM WATER WASHDOWN SYSTEM (ERWWS) STATION
1
OFF
JCV-PRO-3
ON
2
3
Figure 7. Engine Room Water Washdown System (ERWWS) Station
Table 7. Engine Room Water Washdown System (ERWWS) Station (refer to figure 7)
Key
Control/Indicator
Function
1
WWS 1
This valve controls the flow of fire main water to the Water Washdown
System (WWS).
2
HF Sampling Port
This connection is OPENED to allow Hydrogen Fluoride (HF) gas
sampling with the Kwik Draw sampling pump.
3
WWS 2
This valve is OPENED to allow the system strainer to be flushed
during operation of the WWS.
0004 00-9
|