Click here to make tpub.com your Home Page

Page Title: PREVENTATIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR PAINT LOCKER AND EXTERNAL WARNING BELLS FM-200 SYSTEM.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1905-243-24&P
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
6
Annually
Complete FM-200
General Support
Obtain services of Manufacturer's
system
Certified Technical Representative and
perform Annual Recertification.
7
Post system
FM-200 piping and
General Support
Perform test of FM-200 piping and
disassembly
distribution system
distribution system per testing
requirements identified on Drawing LCU-
2K-5553-1.
8
Post system
Complete FM-200
General Support
Obtain services of Manufacturer's
activation
system
Certified Technical Representative and
request System Recertification.
* Note -
Refer to the Kidde Fire Systems FM-200 ECS Series Engineered Design, Installation, Operation and
Maintenance Manual for Marine FM-200 Systems for temperature correction charts.
PREVENTATIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR PAINT LOCKER AND EXTERNAL
WARNING BELLS FM-200 SYSTEM. The following identifies the PMCS required to maintain the Paint Locker
FM-200 system in a fully operational condition:
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
1
Monthly
Pressure, FM-200
Crew
Check pressure gauge for proper
cylinder
operating pressure. If pressure gauge
indicator is not in green, submit Work
Order to General Support (GS)
Maintenance to have cylinder recharged.
2
Monthly
Complete FM-200
Crew
Inspect system components in
System
accordance with instructions contained in
Section II of this document. If any
component is damaged, submit Work
Order to General Support (GS)
Maintenance.
3
Monthly
External Warning Bells
Crew
Inspect external Warning Bell housing
and hammer for corrosion, if present
service and repair as necessary. Refer
to Appendix A, Safety Bulletins for
Warning Bell repair procedure. Lubricate
Hammer
4
Quarterly
Ventilation covers
Crew
Operate and service Paint Locker Supply
and Exhaust Vent covers.
5
Semi-Annually
FM-200 Pressure
Crew
Ensure powered ventilation system
Switch
shutdown is in operation. Manually raise
plunger on Pressure Switch. Confirm
automatic shutdown of ventilation
system. Confirm activation of Warning
Bell. Reset plunger on Pressure Switch.
If ventilation system fails to operate,
summit work order to General Support
(GS) Maintenance. If Warning Bell fails
to operate, repair Warning Bell. Refer to
Appendix A, Safety Bulletins for Warning
Bell repair procedure.
6
Annually
Complete FM-200
General Support
Obtain services of Manufacturer's
system
Certified Technical Representative and
perform Annual Recertification.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business