|
|
TM 55-1905-243-24&P
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
7
Post system
FM-200 piping and
General Support
Perform test of FM-200 piping and
disassembly
distribution system
distribution system per testing
requirements identified on Drawing LCU-
2K-5553-1.
8
Post system
Complete FM-200
General Support
Obtain services of Manufacturer's
activation
system
Certified Technical Representative and
request System Re-Certification.
* Note -
Refer to the Kidde Fire Systems FM-200 ECS Series Engineered Design, Installation, Operation
and Maintenance Manual for Marine FM-200 Systems for temperature correction charts.
PREVENTATIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR TUNNEL FM-200 SYSTEM. The
following identifies the PMCS required to maintain the Tunnel FM-200 system in a fully operational condition:
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
1
Monthly
Pressure, FM-200
Crew
Check pressure gauges for proper
cylinders
operating pressure. If pressure gauge
indicator is not in green, submit Work
Order to General Support (GS)
Maintenance to have cylinder recharged.
2
Monthly
Liquid level, FM-200
Crew
Take liquid level readings in accordance
cylinders*
with instructions contained in Section II of
this document. If liquid level is low,
submit Work Order to General Support
(GS) Maintenance to have cylinder
recharged.
3
Monthly
Complete FM-200
Crew
Inspect system components in
System
accordance with instructions contained in
component is damaged, submit Work
Order to General Support (GS)
Maintenance.
4
Quarterly
Ventilation cover and
Crew
Operate and service Tunnel Supply Fan
watertight closures
Cover and Tunnel watertight vent
closures.
5
Semi-Annually
FM-200 Pressure
Crew
Ensure powered ventilation system
Switch
shutdown is in operation. Manually raise
plunger on Pressure Switch. Confirm
automatic shutdown of ventilation system.
Confirm activation of Warning Light,
Electric Horn/Strobe and Warning Bell.
Reset plunger on Pressure Switch. If
ventilation system fails to shutdown
automatically, submit Work Order to
General Support (GS) Maintenance. If
Warning Light, Electric Horn/Strobe or
Warning Bell fails to operate, repair
component. Refer to Appendix A, Safety
Bulletins for Warning Bell repair
procedure.
2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |