DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
TRANSMISSION REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Personnel Required
Drain Pan (WP 0622, Item 9)
MOS 63B Wheeled vehicle mechanic (2)
Tool Kit, General Mechanic's: Automotive
References
(WP 0622, Item 27)
TM 9-2320-325-14&P
Materials/Parts
TB 9-2320-279-13
Compound, Sealing, Thread
WP 0209
Locking (WP 0625, Item 20)
Oil, Lubricating (WP 0625, Item 37)
Seal, Sentry, Blue (WP 0625, Item 44)
Equipment Conditions
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
Tire carrier removed (TM 9-2320-325-14&P)
Lockwasher (1)
Hydraulic reservoir removed
Lockwasher (1)
(TM 9-2320-325-14&P)
Preformed Packing (1)
Air system drained (TM 9-2320-347-10)
Preformed Packing (1)
Locknut (3)
Lockwasher (6)
Preformed Packing (1)
Preformed Packing (1)
Preformed Packing (1)
Preformed Packing (1)
REMOVAL
1.
Remove crew cab heater hoses from engine (WP 0209). Perform Steps (1), (2), (8), and (9).
2.
Remove personnel cab air conditioner hose and connector (TB 9-2320-279-13).
3.
Remove piping from pump house, roof and bumper turret systems; items 3, 4, and 5, and side discharge
4.
Remove engine (TM 9-2320-325-14&P).
0558-1