DRAFT
TM 5-4210-249-13&P-3
0541
INSTALLATION
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00094
1.
Install bracket (24) on crew cab wall (27) with washer (26) and screw (25).
2.
Install rubber holddown (23) on bracket (24) with screw (22) and locknut (21).
3.
Install rubber holddown (20) on pump operator's platform (4) with two screws (19), four washers (18), and two
locknuts (17).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00093
4.
Install rubber handle (16) on pump operator's platform (4) with two screws (15) and nuts (14).
0541-4