DRAFT
TM 5-4210-249-13&P-3
0443
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT03176
19. Connect pump control wire harness connector (7) on cab power distribution wire harness connector (8).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT03175
20. Install wire 1027 (3), wire 1640 (4), and wire 1023 (5) on cab ground terminal block (6) with lockwasher (2)
and nut (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Install personnel cab instrument panel assembly (WP 0312)
END OF TASK
END OF WORK PACKAGE
0443-14