DRAFT
TM 5-4210-249-13&P-3
0442
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT03170
9.
Install wire 4055 (16) on turret control terminal strip (8) with screw (15).
10. Install wire 2837 (14) on turret control terminal strip (8) with screw (13).
11. Install wire 4037 (12) on turret control terminal strip (8) with screw (11).
12. Install wire 1640 (10) on turret control terminal strip (8) with screw (9).
13. Install wire 2848 (7) on turret control terminal strip (8) with screw (6).
14. Install cover (4) on turret control box (5) with three washers (3), lockwashers (2), and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0442-6