DRAFT
TM 5-4210-249-13&P-3
0402
INSTALLATION
TFFT01303
NOTE
All relays are installed the same way.
Install relay (1) on power distribution box (2).
END OF TASK
FOLLOW-ON MAINTENANCE
Install personnel cab instrument panel A (WP 0311)
END OF TASK
END OF WORK PACKAGE
0402-2