DRAFT
TM 5-4210-249-13&P-3
0297
INSTALLATION
TFFT01081
1.
Install gasket (4) and water level probe (3) on tank (5) with four screws (2).
NOTE
Install cable ties as needed.
2.
Connect connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0297-2