DRAFT
TM 5-4210-249-13&P-2
0217
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00353
NOTE
Perform Step (5) with engine off and low-side hand valve closed.
5.
When charging from bulk container, position bulk container (3) upside down and open high side hand
valve (4).
6.
Allow refrigerant to enter system until 2 lb. to 12 oz. (0.9 kg to 340.2 g) has been added. Close high side hand
valve (4).
7.
Start engine (TM 9-2320-347-10) and generator (WP 0004). Position cab air conditioner controls at maximum
cooling and fan speed. Refrigerant compressor must engage.
8.
Shut OFF engine (TM 9-2320-347-10).
NOTE
Perform Step (8) if charge did not enter system.
9.
Position bulk container (3) in upright position and open low side hand valve (5) to draw vapor into system.
Leave hand valve (5) open until correct weight of refrigerant has entered system. Close low-side hand
valve (5).
0217-13