DRAFT
TM 5-4210-249-13&P-2
FIELD LEVEL MAINTENANCE
CREW CAB AIR CONDITIONER/HEATER ASSEMBLY REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Personnel Required
Tool Kit, General Mechanic's: Automotive
MOS 52C, Utilities equipment repairer
(WP 0622, Item 27)
References
Cap Set, Protective (WP 0622, Item 3)
WP 0614, Fig. 7
Materials/Parts
Equipment Conditions
Adhesive, Sealant, Silicon, RTV
Crew cab air conditioner coolant
(WP 0625, Item 5)
Tags, Identification (WP 0625, Item 51)
Lockwasher (4)
Preformed Packing (2)
REMOVAL
TFFT00683
1.
Remove air output seal (1) from air output seal mount (2).
TFFT00684
2.
Remove four screws (3), washers (4), and air output seal mount (2) from air conditioner/heater assembly (5).
0215-1