DRAFT
TM 5-4210-249-13&P-2
0175
TFFT04314
Step 6.
Turn battery disconnect switch to OFF position (WP 0007). Remove circuit breaker P5
from pump power distribution block (WP 0412). Check for continuity across circuit
breaker P5 terminal connectors.
a.
If there is continuity, replace pump house power distribution wire
harness and block (WP 0457).
b.
If there is no continuity, replace circuit breaker P5 (WP 0412).
0175-5