DRAFT
TM 5-4210-249-13&P-1
0125
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT02719
Step 19.
Disconnect main wire harness pump house power distribution wire harness connector
DP1. With a test lead set, check for continuity across pump house power distribution
wire harness wire 1065 (pink) from relay P6 connector, terminal 5 to pump house power
distribution wire harness connector DP1, terminal 1.
a.
If there is continuity, replace relay P6 (WP 0413).
b.
If there is no continuity, repair wire 1065 in pump house power
distribution wire harness if repairable (TM 9-2320-325-14&P), or
replace pump house power distribution wire harness and
block (WP 0457).
0125-17