DRAFT
TM 5-4210-249-13&P-1
OPERATOR MAINTENANCE
PREPARATION FOR STORAGE OR SHIPMENT
PREPARATION FOR STORAGE (LONG TERM - 6 MONTHS OR LONGER)
1.
Position vehicle in a suitable location to drain and pump out remaining water.
2.
3.
4.
Perform Preventive Maintenance Checks and Services and Lubrication procedures (WP 0186).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT2241
5.
Remove caps (1) on NO. 1 DRIVER SIDE DISCHARGE (2), NO. 2 DRIVER SIDE DISCHARGE (3), NO. 3
PASSENGER SIDE DISCHARGE (4), and NO. 4 PASSENGER SIDE DISCHARGE (5).
6.
Remove cap (6) on main inlet (7).
7.
Remove cap (8) on PASSENGER SIDE AUX. INLET (9).
8.
Remove cap (10) on DIRECT TANK FILL inlet (11).
0043-1