• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FOAM SYSTEM FLUSHING - Continued
POST OPERATION PROCEDURES

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 1 Page Navigation
  158    159    160    161    162  163  164    165    166    167    168  
img
. .
DRAFT
TM 5-4210-249-13&P-1
0040
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00333P
4.
Put foam METERING VALVE (6) in OPEN position.
NOTE
Water must be added into foam tank that is being flushed.
FOAM TYPE SELECTOR switch must be switched to the foam tank (5) that is being
flushed.
5.
Run foam system with water instead of foam (WP 0033).
6.
Discharge water until foam tank (5) is empty.
7.
All debris must be removed from foam tanks after flushing is complete.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT4476A
8.
Close expansion dome hatch (3).
9.
Repeat Steps (1) through (8) to drain and flush foam tank A.
10. Flush foam system (WP 0032).
END OF TASK
END OF WORK PACKAGE
0040-9/(10 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.