• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE ALLOCATION CHART - Continued
MAINTENANCE ALLOCATION CHART - Continued

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  520    521    522    523    524  525  526    527    528    529    530  
img
TM 5-4210-233-14&P-2
MAINTENANCE ALLOCATION CHART
NOMENCLATURE OF END ITEMS: TRUCK, 100 FT. AERIAL LADDER
(1)
(2)
(3)
(4) MAINTENANCE LEVEL
(5)
(6)
DIRECT GENERAL
GROUP
COMPONENT/
MAINT.
UNIT
TOOLS &
SUPPORT SUPPORT
DEPOT
NO.
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIP.
REMARKS
23
AERIAL LADDER/WATER TOWER
ASSEMBLY (Continued )
AERIAL LADDER TENSION CABLES
Inspect  1.0
Adjust
2.0
1
Replace
8.0
1,4
AERIAL LADDER ELECTRICAL CABLES
Inspect  1.0
Adjust
2.0
1
Replace
8.0
1,4
WARNING HORN
Inspect  .10
1
Replace
.50
LADDER LOCK LIGHT
Inspect  .25
Replace
.50
1
24
AUXILIARY POWER UNIT (APU)
Inspect  .50
Replace
6.0
1
Test
1.0
BRUSHES
Inspect
.50
Replace
1.0
1
COMMUTATOR AND COLLECTOR
Replace
1.0
1
RINGS
Repair
3.0
1
ARMATURE
Test
1.0
1
Replace
2.0
1
FIELD WINDINGS
Test
1.0
1
Replace
2.0
1
ANTI-FLICKER POINTS
Adjust
1.0
AND RESISTOR
Replace
1.0
APU PRIMARY FUEL FILTER
Replace
.50
1
B-30


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.