• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE ALLOCATION CHART - Continued
MAINTENANCE ALLOCATION CHART - Continued

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  516    517    518    519    520  521  522    523    524    525    526  
img
TM 5-4210-233-14&P-2
MAINTENANCE ALLOCATION CHART
NOMENCLATURE OF END ITEMS: TRUCK, 100 FT. AERIAL LADDER
(1)
(2)
(3)
(4) MAINTENANCE LEVEL
(5)
(6)
DIRECT GENERAL
GROUP
COMPONENT/
MAINT.
UNIT
TOOLS &
SUPPORT SUPPORT
DEPOT
NO.
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIP.
REMARKS
23
AERIAL LADDER/WATER TOWER
ASSEMBLY
LADDER TREADS
Inspect  1.0
Replace
.50
1
SAFETY RAILINGS
Inspect  .10
Replace
1.0
1
OUTRIGGER WARNING LIGHTS
Inspect  .10
Replace
1.0
1
Repair
1.0
1
OUTRIGGER COMPARTMENT LIGHTS Inspect  .10
Replace
1.0
1
Repair
1.0
1
AERIAL LADDER SPOTLIGHTS
Inspect  .10
Replace
1.0
1
Repair
1.0
1
CONTROL PANEL INDICATOR LIGHTS Inspect  .25
Replace
1.0
1
CONTROL PANEL TOGGLE SWITCHES Inspect  .25
Replace
1.0
1
LADDER LOAD GAUGE
Inspect  .10
Replace
.50
1
SYSTEM PRESSURE GAUGE (0-3000 PSI)Inspect  .10
Replace
.50
1
WATER PRESSURE GAUGE (0-600 PSI) Inspect  .10
Replace
.50
1
FLOW MINDER
Inspect  .10
Replace
.50
1
FLOW MINDER SENDING UNIT
Replace
.50
1
RUN/LOCK LEVER AND LINKAGE
Adjust
1.0
1
Replace
2.0
1
B-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.