• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LADDER ASSEMBLY - Continued
LADDER ASSEMBLY - Continued

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  466    467    468    469    470  471  472    473    474    475    476  
img
TM 5-4210-233-14&P-2
6-78. LADDER ASSEMBLY- Continued
(2) Route or verify routing of electrical cables.
(3) Assemble/install two traveling blocks (1) by pressing new bushings (2) in sheaves (3).
(4) install sleeve pins (4) through bottom plate (5) using screws (6).
(5) Assembly sheaves (3), center plate (7), cylinder block connectors (8) and top plate (9).
(6) Secure traveling block assembly (1) together with tension cables with screws (11), flatwashers (12)
and nuts (13).
(7) Install new wear pads (14) with screws (15).
6-473


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.