5-23. TURBOCHARGER
This task covers:
a.
Removal
d.
Assembly
b.
Disassembly
e.
Installation
c.
Cleaning and Inspection
f.
Follow-on Maintenance
TOOLS REQUIRED
PERSONNEL: 2
Tool Kit, General Mechanics, Automotive
(Appendix B, Section 1II, Item 1)
EQUIPMENT CONDITION
Main Engine Shutdown (see para 2-12.)
Shop Equipment, Automotive
APU Shutdown (see para 2-16.)
Maintenance and Repair
Batteries Disconnected (see para 4-114.)
(Appendix B, Section 111, Item 4)
Parking Brake On (see para 2-12.)
Engine Enclosure Removed (see para 4-127.)
MATERIALS/PARTS REQUIRED
Exhaust Outlet Pipes Removed from Turbocharger
Solvent, Dry Cleaning, (Item 3, Appendix E)
(see para 5-44.)
Grease, Automotive and Artillery (Item 1, Appendix E)
Air Inlet Elbow Disconnected from Turbocharger
Compound, Antiseize (Item 4, Appendix E)
(see para 4-128.)
Oil, Lubricating (Item 10, Appendix E)
Compound, Sealing, Pipe Thread (Item 2, Appendix E)
Brush, Paint, Oval (Item 44, Appendix E)
Grease, Silicone (Item 1 1, Appendix E)
Piston Rings (Figure 94, Appendix F)
Retaining Rings (Figure 94, Appendix F)
Thrust Bearings (Figure 94, Appendix F)
Wear Washers (Figure 94, Appendix F)
Seal Ring (Figure 94, Appendix F)
Inlet Screen Seal (Figure 94, Appendix F)
Journal Bearings (Figure 94, Appendix F)
Gasket (Figure 94, Appendix F)
a. Removal.
(1) Loosen four nuts (1) and clamps (2).
(2) Remove two exhaust tubes (3) from two exhaust
manifolds (4) and tee (5).